BUILDING PLANNING OF THE FUTURE
BIM building

BIM Management

Efficient data management
from the idea to operation

Our BIM management is a key interface for project success. In the coordination of projects in building construction and/or civil engineering, or in the development of corporate or project strategies as part of BIM implementation. As a team, we have decades of experience in the application and implementation of various BIM requirements.

How we implement the BIM requirements

When implementing the requirement, we rely on transparent communication and implementation at the point of value creation. Our LEAN working method enables consistent reporting and a cascading structure of information transfer. In this way, all parties involved receive up-to-date access to information from the BIM models or BIM processes that is appropriate for their function.

BIM expert in a tunnel

Why building data management?

The BIM approach offers many advantages for complex construction projects: it creates transparency, ensures quality and keeps everyone involved informed at all times. Interdisciplinary controlling ensures cost and schedule reliability, identifies problems at an early stage and efficiently manages the course of the project. Thanks to cloud services, BIM provides a comprehensive overview of the planning status and promotes collaboration between architecture, engineering and construction. Structured planning and the continuous monitoring and adjustment of processes with LEAN ensure optimal project coordination.

Image of Building data management

All advantages at a glance

Icon of collaboration

Improved collaboration

Through centralized data management to a building model - as a single point of truth.
Sustainability icon

Sustainability

Derivation and calculation of data from the models for balancing their building characteristics in simulated operation.
Icon of cost savings

Cost and resource savings

By means of precise planning and reduction of errors, considerable costs and wasted time can be reduced.
Icon of efficiency and optimization

Efficiency and optimization

The use of data and models that are continuously optimized improves the efficient implementation of the project and minimizes the risk of information loss.
Icon of an information platform

Exchange of information

All project participants have access to up-to-date information at all times via our project platforms, thus minimizing interfaces that can cause data loss.
Icon of a lightning bolt

Risk minimization

With the help of our BIM-based simulations, we identify risks along the entire planning and execution process - including during building operation.

What

Logo of Madaster

says about us:

The pde is a role model - both professionally and in terms of personal cooperation. We look forward to continuing the joint work between the pde and Madaster intensively and making it even better and more broadly effective together.

Mag. Werner Weingraber (managing Director Madaster Austria GmbH)

What

Logo of PORR

says about us:

I would like to thank you very much for the excellent Revit training. In addition to your enthusiasm for the topic of BIM/Revit, the combination of architecture and building services was particularly brilliant for us. This significantly improved our understanding and gave everyone an insight into the topics and challenges of the other trades.

Thomas Braun (Industrial Construction PORR AG Germany)

What

[Translate to English:] Tennet Logo

says about us:

The pde is reliably and competently implementing the overall BIM coordination on the contractor side for the ElbX project. An experienced, committed team with in-depth expertise in tunnel construction that we can rely on.

Bartosz Bobkowski (Design Manager Tennet)